4I. INTRODUCTION/BACKGROUND:
5
6A system that allows users to have “access” to PGP key but never able to access “private key”, thus allowing admin to have total control to access of information
7
8
9II. TECHNICAL REQUIREMENTS:
10
11The following tasks will be performed by the Collaborator to meet the objectives listed above.
12
13• Web-based interface
14• User access is strictly controlled by admin
15• Each user account has only one key ,
16• Key is loaded by admin (or his delegates) into each of the user account in the easiest way possible
17• Multiple user account can have access to the same key
18• The security of private key is paramount i.e location of the server needs to be hidden from user
19• Trial version first to be hosted on VPS, but may be physically hosted to ensure maximum security
20• This program will be integtrated into other web based applications in the future e.g. through API other web-based application may obtain its functionality without ever having to access the server it self, (or knowing where the server is)
21
22III. DELIVERABLES/SCHEDULE:
23
24The deliverables are listed as follows [include specific timeframe for each deliverable].
251. Proposed solution to be given before 1st April , including solution for secure key management
262. Collaborator to be given access to interim server
273. First version to be delivered by 2rd April
284. Test system , trial private key
295. Final review , and test run , by 4th April
306. Tutorials on how to handle future API
317. Hand over , codes, IP , changes server detail
328. Future maintanence agreement e.g. migration ,
33
34IV. APPLICABLE DOCUMENTS:
35
36 n.a
37
38V. PROVIDED RESOURCES:
39
40Server hosting
41
42VI. PLACE OF PERFORMANCE:
43
44Online / remotely
45
46VII. MONITORING THE PROGRESS:
47
48Collaborator agrees that satisfactory progress will be monitored during the life of the agreement as follows:
491. Communication and progress updates Collaborator will occur regularly via teleconference and email correspondence, to occur at least daily
502. Formal phone meetings will be scheduled to monitor during design stages
51
52VIII. BUDGET AND BUDGET JUSTIFICATION:
53
54AUD$500 for the delivery of main
55
56Future maintenance will need to be determined at the end of the delivery at a pre-determined rate
57